  • Reported By: Gaby — St Louis Missouri United States of America
US Construction
2 Overlook Place CT St Louis, Missouri United States of America

US Construction Rick Bukvic, Refik Bukvic Took us for 5K, did not finish anything started; shoddy work!! St Louis, Missouri

What's this?
What's this?
What's this?
Is this
Ripoff Report
About you?
Ripoff Report
A business' first
line of defense
on the Internet.
If your business is
willing to make a
commitment to
customer satisfaction
Click here now..

Does your business have a bad reputation?
Fix it the right way.
Corporate Advocacy Program™

SEO Reputation Management at its best!

We are in the process of suing this contractor. He is in breach of contract and took us for 5K. This is the letter that went out to the Attorney General's office of Missouri:

In addition to Mr. Bukvic walking out on the contract, we are also left with several problems which are a direct result of Mr. Bukvics incompetence or deliberate attempt to sabotage.

We are still without windows, Mr. Bukvic told us he had ordered windows on July 5, 2011 Home Depot confirmed several other orders on his account but a window order was  NEVER placed on his behalf. Because Mr. Bukvic has taken out the window and the framing, we are looking at 3-4 weeks and a cost of $1000 to replace both windows. Plus our electric bill was $400 for the time the windows were out.

There are several other damages we are left with which we discovered after filing the complaint:
Trouble finding a contractor willing to finish his work Contractors hesitant because Mr. Bukvics taping and mudding was
wrong. He also used wrong panels for the drywall in the bathroom.
Plumbing and electrical work should be completed BEFORE hanging drywall. Most drywall needs to be taken down to plumb and do electrical work now.
Hardwood floor was damaged by Mr. Bukvic.
A hole was left in the basement drywall when he was checking for plumbing
Wrong drywall was used in what is supposed to have been the bathroom (needs moisture absorbent)
Left old carpeting in crawlspace instead of disposing of it potential fire hazard

 Not only are we way behind schedule on our project due to him walking out, we are also unable to find someone to continue/ repair his work in a cost effective, timely manner.  

This report was posted on Ripoff Report on 03/24/2012 09:48 AM and is a permanent record located here: http://www.ripoffreport.com/r/US-Construction/St-Louis-Missouri-63129/US-Construction-Rick-Bukvic-Refik-Bukvic-Took-us-for-5K-did-not-finish-anything-started-858727. The posting time indicated is Arizona local time. Arizona does not observe daylight savings so the post time may be Mountain or Pacific depending on the time of year.

Ripoff Report has an exclusive license to this report. It may not be copied without the written permission of Ripoff Report.

Click Here to read other Ripoff Reports on US Construction

Search for additional reports

If you would like to see more Rip-off Reports on this company/individual, search here:

Search Tips
Report & Rebuttal
Respond to this report!
What's this?
Also a victim?
What's this?
Repair Your Reputation!
What's this?