X
What do hackers,
questionable attorneys and
fake court orders have in common?
...Dishonest Reputation Management Investigates Reputation Repair
Free speech rights compromised

WATCH News
Segment Now
Ripoff Report | Wroughtcorp, Shawn Review - Mukilteo, Washington
Ripoff Report Needs Your Help!
X  |  CLOSE
Report: #307649

Complaint Review: Wroughtcorp, Shawn Roten, Left Coast Construction - Mukilteo Washington

  • Submitted:
  • Updated:
  • Reported By: Anacortes Washington
  • Author Confirmed What's this?
  • Why?
  • Wroughtcorp, Shawn Roten, Left Coast Construction Mukilteo, Wa Mukilteo, Washington U.S.A.

Wroughtcorp, Shawn Roten, Left Coast Construction Liar, balldropper, incompetent Mukilteo Washington

*Author of original report: Shawn Roten - Wroughtcorp Timberbuild Timberland Homes (((odd text characters)))

Show customers why they should trust your business over your competitors...

Is this
Ripoff Report
About you?
Click here now..

My house was to be finished in feb 07. Home is still not done in Feb 08. Builder does not answer email or phone calls... just text messages. Doesn't answer these now since I have an attorney after him. Constant liar. Does not deliver. Flunked at least 10 inspections by the city of Seattle building department.

Remember the builder's name - SHAWN ROTEN.

Ntuit1
Anacortes, Washington
U.S.A.

This report was posted on Ripoff Report on 02/09/2008 04:13 PM and is a permanent record located here: https://www.ripoffreport.com/reports/wroughtcorp-shawn-roten-left-coast-construction/mukilteo-washington/wroughtcorp-shawn-roten-left-coast-construction-liar-balldropper-incompetent-mukilteo-307649. The posting time indicated is Arizona local time. Arizona does not observe daylight savings so the post time may be Mountain or Pacific depending on the time of year. Ripoff Report has an exclusive license to this report. It may not be copied without the written permission of Ripoff Report. READ: Foreign websites steal our content

Search for additional reports

If you would like to see more Rip-off Reports on this company/individual, search here:

Report & Rebuttal
Respond to this report!
What's this?
Also a victim?
What's this?
Repair Your Reputation!
What's this?

Updates & Rebuttals

REBUTTALS & REPLIES:
0Author
1Consumer
0Employee/Owner

#1 Author of original report

Shawn Roten - Wroughtcorp Timberbuild Timberland Homes (((odd text characters)))

AUTHOR: N - (U.S.A.)

POSTED: Thursday, May 08, 2008

I finally fired this guy. Should have done it long ago. Here are the reasons:
1. Gross Incompetence and Dishonesty
o Failure to Complete Project
o Failure to meet 21 communicated end date timelines
o Flunking numerous inspections from the City of Seattle, etc.
Red Tag actions
o Failure to keep customer timely informed of building progress, changes, and cost overruns.
o Failure to respond to and meet repeated customer demands
Time Mismanagement
o Numerous outstanding complaints as per WSD L&I
o Suspension of contractor license as of 9/6/07
o Failure to Make Safe Entry into Dwelling
o Unauthorized Removal of Vegetation
o Failure to Connect Gas Utility
o Failure to Connect Sewer Utility
o Failure to Connect Water Utility
o Failure to Secure Dwelling After Repeated Requests
o Failure to Protect Dwelling from Adverse Elements Resulting in Damages
o Failure to Complete Interior Painting
o Failure to Provide Timely Receipts of Expenses
o Failure to Pay Utilities on Time
o Misc other

2. Failure to Respond to Legal Correspondence
Ignored letter from attorney 2/4/08

3. Refusal to Work
Walked off the project 4/24/08

4. Refusal to Compensate Owner for Repeated Extension of Timeline, est ($70,000+)

5. Misappropriation of Allocated Funds
Duplicate Honey Bucket charge for $117.19

Home Depot
a) Candy $ 2.38 11/15/06
b) Silt Fencing (2 @ $19.97 pl tax) 11/15/06 thru 1/29/07
c) Gloves - $9.96 pl tax 11/21/06
d) Diet Coke - $2.16 pl tax 11/18/06
e) Candy - $1.98 11/18/06
f) VAULT Energy Drink - $1.08 pl tax 11/18/06
g) Powerade - $1.08 pl tax 11/18/06
h) 20 x 100 Poly Sheet - $79.87 11/21/06
i) Mtn Blast - $0.99 7/28/07
j) Candy - $2.38 7/28/07
ALKI Lumber
a) Silt Fencing (1 @ $38.99 pl tax) 1/31/07

Lowes
a) Gatorade - $1.47 8/15/07
BMC West
a) 3 x Silt Fencing w/stakes $113.13 (see previous like items) 5/21/07
b) 3 x Visqueen Black 20x100 - $183.00 (see previous like items) 5/21/07
c) 100 x stakes - $20.66 - 5/21/07
d) Gloves - $4.99 9/10/07
o Penske Truck Rental - $211.90 12/27/06
o Quality Exterior, Inc - Finance Charges on Overdue Balance - $473.44 8/23/07
o Rodda Paint Co. - $16.70 Rollers, brush, extension 2/1/07
o Generator rental, Hertz, $250.00, 1-10-07 thru 1-17-07
o NSF Charge Valley Constr. Supply, $60.00 11/22/06


6. Failure to Provide Complete Accountability of Expended Funds and Receipts

o Manuel Munoz ?? - $9,900.00
o Broadband Utility Specialists (???) - $920.00
o TRM TRIM ??? No record found, no phone number billed $13,717.25
o Heidelberg Cement Group no item listed - $5650.76
o ALKI Lumber & Hardware no items listed - $148.05 11/05/07
o ALKI Lumber & Hardware no items listed - $15.53 no date
o ALKI Lumber & Hardware unidentified items - $44.87 11/26/07
o ALKI Lumber & Hardware unidentified items - $54.86 no date
o ALKI Lumber & Hardware unidentified items - $4.14 4/26/07
o ALKI Lumber & Hardware no items listed - $25.12 no date
o ALKI Lumber & Hardware no items listed - $23.95 2/4/06 (prior to project start)
o Greer Construction Packing List - $102.99
o BMC West Quote - $3207.55 12/20/06
o BMC West Missing Invoice - $1418.70 2/21/07 purchase date
o BMC West Acknowledgement - $311.87 1/2/07
o Smokey Point Masonry $268.54 Teton Shadow rock 5/16/06 (prior to project start)
o Cabinet Quote, no invoice, charged $7855.45 Alpine Cabinets 4/5/07
o Home Depot- Rebar Cutter Rental #15830, no receipt - $229.78 11/25/06

7. Falsified Construction Records with City of Seattle, etc.
Recorded WroughtCorp as property owner on demolition project 9/14/06
Recorded WroughtCorp as property owner on construction permit 9/14/06

8. Failure to Deliver Purchased Material
o Crown Molding - $387.50 (BMC Building) 1/04/07
o 16 x raised panel doors - TRM TRIM - $2,880.00 9/20/07
o 1 x Raised panel bomber TRM TRIM - $200.00 - 9/20/07
o 4 x Raised Panel Double Doors TRM TRIM - $840.00 - 9/20/07
o 1200 1 x 6 VGF Fir Trim TRM TRIM - $2,004.00 - 9/20/07
o 400 1 x 5 VGF Fir Trim TRM TRIM - $9,08.00 - 9/20/07
o 800 1 x 6 VGF Fir Trim TRM TRIM $2,720.00 - 9/20/07
o Hardwood flooring - $3,150
o Floor Tiles - $4,500
o Counter Tops - $4500.00
o Tools Purchased Home Depot
o Staple Gun - $16.43 pl tax 11/18/06
o Saw - $12.94 pl tax 11/18/06
o Saw - $12.94 pl tax 11/03/07
o 6 pc Plier - $19.97 pl tax 11/03/07
o Folding Razor - $9.97 pl tax 11/18/06
o Folding Razor - $7.98 pl tax 7/14/07
o Folding Razor - $7.98 pl tax 11/03/07
o Folding Razor - $7.98 pl tax 7/24/07
o Rubber Boots - $31.96 pl tax 11/21/06
o Strip Nailer - $319.00 pl tax 1/31/07
o Air Hose - $44.98 pl tax 1/31/07
o 1/2 18V Drill - $189.00 pl tax 1/31/07
o 3 pc Chisel - $19.88 pl tax 11/03/07
o 80 pc Screwdvr - $20.00 pl tax 11/03/07
o 12 Gal SHOPVAC - $69.97 11/03/07
o Hole Saw - $13.94 pl tax 7/25/07
o Hole Saw - $27.49 pl tax 7/25/07
o Folding Knife BMC West - $10.45 10/10/07
o Chalk Line and Chalk ALKI - $12.48 1/8/07
o Chalk Reel ALKI - $4.99 3/14/07
o Marathon Blades ALKI - $21.98 1/22/07
o Marathon Blades ALKI - $21.98 3/14/07

9. Failure to Pay Vendors

Pacific Concrete Pumping, $689.11 - 11/20/07 status-unpaid


10. Fraudulent Billing

CADMAN Heidelberg Cement Group Invoice states customer is Scott Greer @ 3446 Walnut Ave, Seattle. Job address listed as 4409 39th Ave SW. Six invoices totaling $15,687.65.

11. Failure to Build Structure by Approved Plans
o Interior door not installed in bottom bedroom
o Bottom floor office exterior door not installed
o Deck railing and stairway not installed
o Fireplace interior and exterior rock replaced with cedar shakes
o Wood flooring not installed
o Floor Tile not installed

12. False Promise to Provide Free Listing and Sale of Home

13. Poor Workmanship and Damage to Dwelling

o Foundation wall in garage are not straight and blown out
o Heating pipes and tubes not hidden inside walls, need support and chase work
o Failure to prime sheet rock before painting
o Suspected watered down paint blotchy appearance
o Shoddy painting overall
o Garage door dented, broken, and out of alignment, does not open completely
o Crawl space is flooded and does not have any insulation on interior walls
o All door and window frames/sills do not have stain or varnish to protect them. Dirt, grime, and water damage will need to be sanded off and restained
o Front entry door is second-hand and warped at the jam, poor installation
o Used combination of deck nails and boxed nails. Nail head is larger than the other and very noticeable
o Rails on deck are not installed. Deck posts do not meet the center of pier block foundation and one of them is not used
o Chimney chase should be stone not wood shingles. Shingles crooked, poor workmanship
o Three inch gap between fachia and chimney chase

Respond to this report!
What's this?
Featured Reports

Advertisers above have met our
strict standards for business conduct.